C-06 / Capability · Sialkot, Pakistan
Clothing sample maker: proto, fit and pre-production samples
Proto, fit and pre-production samples with a documented approval gate before any bulk fabric is cut.
Sampling & Prototyping at a glance
- Development sample
- Min. 1–2 weeks from locked inputs
- Revisions
- Documented per round
- Approval gate
- Signed PP sample locks the spec
- Shipping
- Courier worldwide, tracked
How sampling & prototyping works at LOMERAQ
No bulk order starts without an approved pre-production sample. The sampling sequence — proto, fit, PP — exists to move every decision (fabric, fit, decoration, labels, packing) in front of the point where changing it becomes expensive.
Each revision round is documented with photos and measurements so approval is a matter of record, not memory.
How the sampling sequence works
Samples are built from the same specification, fabrics and decoration methods planned for bulk, so what you approve is the reference production works to. A full development runs through the steps below.
Which stages a style needs is agreed during the RFQ: a new pattern usually needs proto and fit rounds, while a repeat of an approved style already has its reference sample.
- Proto sample: the first make of the style, to check construction and overall look.
- Fit sample: checked against your measurement sheet, with corrections recorded per point of measure.
- Pre-production (PP) sample: the final fabric, trims, decoration, labels and packing as bulk will run.
- Signed approval: the signed PP sample locks the spec, and bulk fabric is cut only after that.
What to send to start a sample
With a tech pack, send it with the measurement sheet, fabric preference and artwork. Without one, a reference garment, sketch or brief is enough to start ODM development, where our pattern room drafts the block and proposes fabric options. Development samples take a minimum of 1–2 weeks from locked inputs. That is a planning minimum, not a promise; revisions and complex styles add time.
If you are matching a fabric you already use, send a swatch with the sample request so fabric options can be counter-sampled from it, with verified composition and GSM.
The more decisions are locked at the start, such as fabric weight, colour references, size range, trims and decoration, the fewer rounds the sample needs. Open questions are fine, but each one becomes a decision made on a sample rather than on paper.
What you approve before bulk
The PP sample is the reference for everything that follows. Before signing it, check fabric and colour, fit against your measurements, print or embroidery placement and quality, labels and hangtags, and the packing method. Each revision round is documented with photos and measurements, so a change you asked for in round one is still on record in round three.
If something on the PP sample is not right, it goes back as a documented revision rather than a verbal note, and bulk does not start until the corrected sample is approved.
Signing the PP sample is your decision; until it is signed, the spec is still open and bulk fabric is not cut.
Which product families it covers
Sampling applies to every product family we make: knits such as T-shirts, polos and hoodies; wovens and outerwear such as windbreakers, bomber jackets and trousers; leather and suede garments; and motorsport pieces such as karting gear and motorbike suits, where any protection or homologation requirement is confirmed per RFQ, never assumed.
Decoration follows the same gate: print and embroidery are produced at partner units and checked by us on production fabric before you approve them.
Manufacturing examples

Technical windbreaker set
Hooded full-zip windbreaker with mesh-lined hood and contrast shoulder stripe, plus matching pant with side stripe, zip pockets and ankle zips — shown undecorated, ready for decoration.

Custom embellished hoodie
Heavyweight fleece pullover hoodie, colour-blocked in two panel variants, with 3D-puff chest embroidery, flat logo and cuff embroidery, woven neck label and printed care label.
Frequently asked questions
How long does a development sample take?
A minimum of 1–2 weeks from locked inputs. Treat it as a planning minimum, not a promise: each revision round and more complex styles add time. Courier shipping is tracked.
Can I start sampling without a tech pack?
Yes. Send a reference garment, sketch or brief and our pattern room develops the block and fabric options with you. The resulting specification is documented and belongs to your brand.
How many revision rounds are there?
As many as the style needs to reach an approvable PP sample. The number depends on how much changes between rounds, and each round is documented with photos and measurements.
How do I know bulk will match the sample?
The signed PP sample locks the spec. At final inspection, finished goods are audited against that approved sample before cartoning. If you need a written inspection report, agree its scope in the quotation.
Request a sample