05 / PRODUCTIE
In de fabriek — Sialkot, Pakistan
Operationele competentie die je kunt verifiëren — geen bijvoeglijke naamwoorden. Elke claim hieronder verwijst naar bewijs of zegt duidelijk dat verificatie nog loopt.
Gedetailleerde specificaties, procesbeschrijvingen en het aanvraagformulier op deze pagina zijn in het Engels totdat de vertaling is afgerond. Ons team antwoordt in het Engels.
Factory identity
- Brand
- LOMERAQ™
- Location
- Sialkot, Pakistan (UTC+5)
- Address
- Shared with buyers during the RFQ process
- Model
- B2B manufacturing and bulk supply — not a marketplace or trading company
- Markets
- Europe, United Kingdom, United States
- Working hours
- Mon–Sat, 09:00–18:00 PKT (UTC+5)
Our factory is in Sialkot, Pakistan — one of the world's established apparel and sporting-goods export clusters. A detailed address is shared during the RFQ process.
Production floors
A
Cutting
Lot-controlled lays and shade sorting so every panel in a garment shares a dye lot
B
Sewing
Lines organised by product family — knits, wovens, outerwear, leather
C
Decoration
Embroidery and printing proofed on production fabric before bulk (in-house scope under verification)
D
Finishing
Pressing, trimming, needle detection, final inspection, packing
Factory photography and a 60–120 s floor video are the P0 media assets pending for this page (§49).
Zo werkt productie
Jouw input
Tech pack, reference image or product idea, plus estimated quantity
Onze output
RFQ acknowledged with an ID; request routed to a technical reviewer
Timing
On receipt
Proof register
Trust claims are maintained like specifications: each has an evidence source, an owner and a status. ■ Confirmed items are owner-verified facts; □ Pending items are not presented as fact anywhere else on this site.
| Claim | Evidence | Owner | Status |
|---|---|---|---|
| Factory located in Sialkot, Pakistan | Owner confirmation; facility photography and address shared during RFQ | Management | ■ Confirmed |
| Minimum order 25 units | Owner confirmation; colour based on buyer request, configuration confirmed in RFQ | Sales | ■ Confirmed |
| Sample development min. 1–2 weeks | Owner confirmation; presented as a planning minimum | Sample room | ■ Confirmed |
| Bulk production timing | Depends on quantity and scope — quoted per project; verified operational ranges pending | Production | Quoted per project |
| Monthly capacity | Line list and machine register; must state installed vs typical utilised | Production | □ Pending verification |
| 3-gate quality system | Inspection checklists, sample inspection reports | QC | ■ Documented |
| Decoration methods in-house vs outsourced | Equipment register per method | Production | □ Pending verification |
| Export documentation capability | Shipping records by market; Incoterms offered | Logistics | □ Pending verification |
| Certifications | Certificate name, scope, issuing body, expiry — listed only when current | Compliance | □ Pending verification |
| Sustainability claims | Material certificates and traceability only; no generic 'eco-friendly' wording | Compliance | Policy set |
Verify us before you commit
Browse proof first — no salesperson required