LOMERAQ

05 / FABRICATION

Dans l'usine — Sialkot, Pakistan

Une compétence opérationnelle vérifiable — pas des adjectifs. Chaque affirmation ci-dessous renvoie à sa preuve ou indique clairement que la vérification est en cours.

Les spécifications détaillées, les descriptions de processus et le formulaire de demande de cette page sont en anglais en attendant la fin de la traduction. Notre équipe répond en anglais.

Factory identity

Brand
LOMERAQ™
Location
Sialkot, Pakistan (UTC+5)
Address
Shared with buyers during the RFQ process
Model
B2B manufacturing and bulk supply — not a marketplace or trading company
Markets
Europe, United Kingdom, United States
Working hours
Mon–Sat, 09:00–18:00 PKT (UTC+5)

Our factory is in Sialkot, Pakistan — one of the world's established apparel and sporting-goods export clusters. A detailed address is shared during the RFQ process.

Production floors

A

Cutting

Lot-controlled lays and shade sorting so every panel in a garment shares a dye lot

B

Sewing

Lines organised by product family — knits, wovens, outerwear, leather

C

Decoration

Embroidery and printing proofed on production fabric before bulk (in-house scope under verification)

D

Finishing

Pressing, trimming, needle detection, final inspection, packing

Factory photography and a 60–120 s floor video are the P0 media assets pending for this page (§49).

Comment se déroule la production

Votre apport

Tech pack, reference image or product idea, plus estimated quantity

Notre livrable

RFQ acknowledged with an ID; request routed to a technical reviewer

Délai

On receipt

Proof register

Trust claims are maintained like specifications: each has an evidence source, an owner and a status. ■ Confirmed items are owner-verified facts; □ Pending items are not presented as fact anywhere else on this site.

ClaimEvidenceOwnerStatus
Factory located in Sialkot, PakistanOwner confirmation; facility photography and address shared during RFQManagement■ Confirmed
Minimum order 25 unitsOwner confirmation; colour based on buyer request, configuration confirmed in RFQSales■ Confirmed
Sample development min. 1–2 weeksOwner confirmation; presented as a planning minimumSample room■ Confirmed
Bulk production timingDepends on quantity and scope — quoted per project; verified operational ranges pendingProductionQuoted per project
Monthly capacityLine list and machine register; must state installed vs typical utilisedProduction□ Pending verification
3-gate quality systemInspection checklists, sample inspection reportsQC■ Documented
Decoration methods in-house vs outsourcedEquipment register per methodProduction□ Pending verification
Export documentation capabilityShipping records by market; Incoterms offeredLogistics□ Pending verification
CertificationsCertificate name, scope, issuing body, expiry — listed only when currentCompliance□ Pending verification
Sustainability claimsMaterial certificates and traceability only; no generic 'eco-friendly' wordingCompliancePolicy set

Verify us before you commit

Browse proof first — no salesperson required

Demander un devis